Continuation of One Zero Three…
Tank in:
Pipework in:
Test of the weir box… Watertight seals on the plumbing:
First round of equipment:
Filter roller built and plumbed in. Return pump in:
Skimmer and controllers in:
Will fill the tank with RO at this point to check it’s level and true when full. Can pump the water back into barrels to mix with salt, then continue installing further equipment.
All things willing, should have everything from One Zero Three transferred in by Friday 😎