- Joined
- 18 Feb 2015
- Messages
- 263
The floor is almost like a wave affect. Problem is moving the tank and having some were for the tank to stay for a few days until the cement went off. Only way I think would be to lay several straps of cement and sit the 18mm ply on and set it level and then build the frame on top of the level board. It's a bloody lot of work involved and I have 5 ppl living in my house. It would completely take up the living roof for a few days. Am I just being paranoid about it collapsing or what?Well should be flat & level then, these type of tiles should be laid on self levelling compound.
If not (why not), then 18mm ply base with packing laths across each flag is the way forward.
I am not convinced that the bare ends of the 2x3 (?) timber you have used should be placed directly on tiles as if for what ever reason there is no grout under a tile, it will most likely crack the tile as well as providing a handy sponge for any spilt water to be absorbed by.
I've got a company coming out tomorrow to fit out the doors on the front to make this look like furniture. Ha ha the stress one takes on' I get enough of my kids